Skip to content

“Addis Ababa, where new good news is heard, has emerged today with another success and another new victory story” Mayor Adanech Abebe

Another height and beauty cloak for the city. Addis Ababa Mayor Adanech Abebe stated that the development of the Bole Corridor, which not only has a beautiful appearance, but also provides modern universal services, was inaugurated and opened for use in the presence of the Honorable Prime Minister Abiy Ahmed (Dr.).

Newsroom · · 2 min read

Mayor Adanech Abebe announced the main works done in the development of the corridor.

1. Areas developed in the corridor
• From Bole Medhanialem- Golagul – to the British Embassy
• From Bole Medhanialem – to Moenko
• From Bole School – to Adey Ababa Model Village
• From Imperial Hotel – to Shala Park
• From Chichina– to Bole Rwanda
• From Adey Ababa Stadium – to Bole Road
• Internal road network

2. General scope of development and infrastructure
• 57 hectares of development area
• 17 km. Road length
• 34.km. Footpath
• 8 km. Cycle path
• 3 vehicle and pedestrian crossing bridges
• Parking lots that can park 5,880 cars at a time
• 150 electric car chargers
• 13 taxi and bus loading and unloading places

3. Underground infrastructure
• 17 km. Drainage and drainage lines
• 17 km. Drinking water lines
• 17 km. Electric lines
• 17 km. Telecom lines
• 17 km. ITS lines

4. Commercial, employment, residential and recreational development
• 91 new commercial buildings
• 3,118 commercial shops newly built and renovated
• A renovated model village with 152 houses
• 33 cafeterias
• 20 restaurants
• 440 renovated buildings
• 2 libraries
• 7 children’s toys
• 7 sports fields and gymnasiums
• 7 waterfalls and fountains
• 5 public entertainment and plazas
• Wide green areas
• Public toilets

5. Development of institutions
– 2 school construction and expansion buildings
– 2 police station construction and expansion buildings
– 1 tourist information center

6. Job creation
• 23,000 citizens got employment during construction.
• Tens of thousands of permanent job opportunities will be created.

Mayor Adanech Abebe to the leaders at all levels who have left their historical mark on this project and coordinated day and night to complete it on time; The contractors and experts also expressed their gratitude to the local community.

Share

YouTube

አማEN